California Title 24 Pools

A checklist for the California pool pad.

California pool pad checklist

Check the boxes for a sun-run pool pump

Item one: a SunRay hybrid runs 100% solar-powered during the day. The rest of the list follows.

Kits listed from $1,999

Checklist

§1Panels and pump

Each kit pairs the pump with its own panels, and no AC is needed for the solar to work.

§2Codes and permits

Title 24 is California's energy code, and local rules for pool equipment vary by city.

Your installer and local building department handle permits; SunRay answers equipment questions.

§3Operating cost

Owners commonly save $100-$250 a month, up to 30% on the utility bill in some homes.

Shipping

  • Kits ship free to California and every other state, Hawaii included.
  • Outside the U.S.: free shipping to your freight forwarder in Florida (the forwarder's freight afterwards is extra).
  • Puerto Rico ships by U.S. Postal Service.
  • Alaska and pump-only orders: ask us about shipping terms.